04Projects

Projects built by RCR

Hospitals, airports, a school and Miami Metrorail, with photos and videos taken by our own crew.

1,456

building permits

Source: BuildZoom · retrieved 09/01/2026

Residential (16)

04.1Project list

04.2Project sheets

RCR excavator and trench next to a building on the Jackson Memorial Hospital project
Service connection trench · Jackson Memorial
No.
01
Sector
Healthcare
Year
2024
County
Miami-Dade

Project

Jackson Memorial Hospital

Scope

Plumbing infrastructure changes on the hospital project: trenching, underground service connections, domestic water and slab sleeves.

Record

3 photos
Quote a similar project
RCR plumber moving material on the apron, with an airplane behind
Apron · Southwest offices
No.
02
Sector
Aviation
Year
2024
County
—

Project

Southwest Airlines offices

Scope

Infrastructure changes in the airline offices: interior slab trenching and new lines.

Record

2 photos
Quote a similar project
View of the Palm Beach airport apron with work trucks and a Southwest airplane in the background
Apron · PBI
No.
03
Sector
Aviation
Year
2024
County
Palm Beach

Project

Palm Beach International Airport

Scope

General plumbing changes at the airport: roof, apron and interiors.

Record

4 photos
Quote a similar project
Drawing title block: Miami International Airport, British Airways Lounge at E. Satellite Terminal
The project drawing
No.
04
Sector
Aviation
Year
2025
County
Miami-Dade

Project

British Airways Lounge, Miami International Airport

Scope

General plumbing for the new lounge at the MIA E Satellite Terminal: copper and cast iron rough-in inside metal stud walls.

Record

2 photos
Quote a similar project

Photo record pending

Ask us about the scope of this project: 305-336-1646.

No.
05
Sector
Transportation
Year
2024–2025
County
Miami-Dade

Project

Metrorail Station, Coconut Grove

Scope

Plumbing infrastructure changes at the station.

2,000+ ft · copper pipe

RCR plumber on a ladder working in the ceiling at South Miami Senior High
Piping above the ceiling · South Miami Senior High
No.
06
Sector
Education
Year
2025
County
Miami-Dade

Project

South Miami Senior High School

Scope

More than 2,000 feet of copper pipe installed in the school infrastructure.

Record

1 photo
Quote a similar project
Plumbing drawing for the Altitude project in Coral Springs, dated June 6, 2024
The project drawing
No.
07
Sector
Local commercial
Year
2024
County
Broward

Project

Altitude Trampoline Park

Scope

Plumbing for the trampoline park commercial space.

Record

1 photo
Quote a similar project

04.3Field record

What a permit does not show: trenches, valves, ceilings and restrooms, photographed by the crew itself on their phones.

  • Open trench in a yard, with the excavator arm
    C-01 · Yard trench · water line
  • Trench along a parking lot, marked with a barrier
    C-02 · Marked trench
  • RCR plumber joining PVC pipe inside a trench
    C-03 · PVC joint
  • PVC drain stub-outs ready before the slab pour
    C-04 · Drains before the slab
  • RCR operator on a mini excavator next to large-diameter blue pipe
    C-05 · Mini excavator on site
  • RCR crew assembling a large-diameter water line
    C-06 · Large-diameter water line
  • Large blue control valve at a water facility
    C-07 · Control valve
  • RCR plumber on a ladder working above an office ceiling
    C-08 · Above the ceiling
  • RCR plumber digging next to a wall to reach the pipe
    C-09 · Excavation along the wall
  • RCR plumber laying out the pipe route on a new construction lot
    C-10 · Layout on new construction
  • Plumber installing the sinks in a commercial restroom
    C-11 · Commercial restroom · installation
  • Finished commercial restroom with a row of sinks
    C-12 · Commercial restroom · finished
  • RCR plumber unloading material on an airport apron
    C-13 · Material on the apron
  • RCR plumber on a ladder installing pipe hung from the ceiling
    C-14 · Hung piping
  • Two RCR plumbers securing pipe above the ceiling
    C-15 · Securing pipe
  • Copper supply and drain rough-in inside metal stud walls
    C-16 · Copper rough-in
  • Photos taken by the crew on their phones. Captions describe the work, not the location.

04.4Next step

Have a similar project?

Quote a similar project

Emergency at home?

Call 24/7 · 305-336-1646

Is it an emergency?

305-336-1646

24 hours, 7 days. A real person answers, day and night.

Have a project?

Send your plans and we return a written estimate.

Get a quoteCall 24/7